OISD 118 refinery quiz

Interactive Quiz: Can You Navigate OISD 118 Challenges in Refinery Upgrades?

Test your knowledge and problem-solving skills on applying OISD 118 guidelines to complex refinery upgrade projects. This quiz will challenge you on real-world scenarios, particularly focusing on inter-distance compliance and brownfield solutions. For a deeper dive into practical strategies, check out our comprehensive article: “Refinery Upgrade: How We Met OISD 118 Inter-Distance Rules in a Live, Space-Constrained CDU“.

Knowledge Quiz: OISD 118 Application

1. In a brownfield refinery upgrade, you need to increase the capacity of a crude distillation unit (CDU). This necessitates adding a new heat exchanger train. However, due to severe space constraints, the new exchangers cannot meet the prescribed OISD 118 inter-distance requirements from existing furnaces using traditional layouts. Which of the following is the most innovative and practical solution to consider for compliance, assuming the existing plot cannot be expanded?

2. When considering the re-routing of large-diameter pipelines overhead in a live refinery unit to achieve OISD 118 inter-distance compliance, which of the following engineering aspects is MOST critical to analyze to ensure operational integrity and safety?

3. OISD 118 typically specifies minimum inter-distances between hazardous installations. In a brownfield scenario where these distances cannot be met due to existing infrastructure, what is a recognized engineering control that can often be implemented as an “equivalent” safety measure, provided it’s properly designed and approved?

4. A key challenge in brownfield refinery projects compared to greenfield projects, especially concerning OISD 118 compliance, is:

5. What role does early engagement with regulatory bodies (like OISD) play in successful brownfield refinery upgrade projects that face inter-distance challenges?

"Master Piping Engineering with EPCLAND's Complete Course, designed for real-world success."