Underground Piping and Layouts
About Course
What you’ll learn
- All about Under Ground Piping
- Basic Definitions
- Various Rules to be followed
- General Terms : Catch basin, Manholes, Valve Pits, Diversion Pits, Invert Elevations, Listing Stations
- Various Underground Networks : Oily water, Contaminated Rain water, Cooling Water, Closed drain networks
- Trench Piping
- Composite drawings
- Scope & Responsibility Splits
This covers, Why UG piping is required, what basic rules need to be followed. It covers most the underground items eg. Catch basin, Manholes, Valve Pits, Diversion Pits, Invert Elevations, Listing Stations. Various open and closed drain networks are also covered along with Cooling water network. Most of the critical things about Composite drawings are also covered eg What are those drawings and why those drawings are required, who are the various stakeholders involved and basic required to generate these drawings.
Various drawings, cross sectional views have been added at various stage of the course which can be very useful to understand the fundamentals.
In the end we will discuss the various scope & responsibility splits among various disciplines. all phases from Proposal to Feed to Detailed design stages have been covered to understand the scope & responsibilities of various disciplines.
In this course my Dear Friend Mr. Laxmikant Sawleshwarkar has helped a lot. His contributions have really helped to add more value to the content. I am sure he is going to contribute in upcoming courses too.
Dont miss to provide your feedback.
Course Content
Underground Piping and Layouts
-
Index of Under ground piping
04:07 -
General terms Index
01:00 -
Underground Piping: Rules to remember
14:19 -
UG Networks: Important things
02:33 -
Manholes in Cooling water systems
09:21 -
Catch Basin
05:05 -
Clean out pits
02:44 -
Invert elevation
00:19 -
Diversion pits
03:05 -
Diversion Pit-1
02:16 -
Trench Piping
03:22 -
Valve Pit
01:11 -
Vent Piping
02:21 -
Understanding the UG networks
04:48 -
Open Drain networks
08:52 -
Oily Sever Network
00:23 -
Cooling Water Network
17:00 -
Closed Drain Networks
02:52 -
Composite index
01:26 -
Composite drawings
12:47 -
Scope Split: Underground activities
08:18
Earn a certificate