Green Ammonia Plant Estimator

Green Ammonia Plant Estimator

A Techno-Economic Analysis Dashboard by ATUL SINGLA

INPUTS

BASIC REQUIREMENTS

UnitsNH3H2N2
kTPA
TPD
TPH
Kg/hr
kg/sec
Nm3/hr

ELECTROLYSER & STEAM BALANCE

ParameterValueUnit
Installed ElectrolyserMW
Required ElectrolyserMW
Daily Op. Hourshr
Steam Balance
Generation PotentialTPH
Consumption DemandTPH
Is Self-Sufficient?

POWER (in kW)

ConsumerSteam CaseAll Electric Case
Ammonia Unit
Electric Heater (Start-up)
Syngas Compressor
Nitrogen Compressors
Ammonia Refrigerant Compressor
Process Pumps (BFW, Product, etc.)
Total (Ammonia Unit)
Electrolyser
Electrolyser System
Electrolyser BOP
Total (Electrolyser)
Cooling Tower
Pumps
Fans
Total (Cooling Tower)
ASU
Total (ASU)

OVERVIEW OF CAPEX VS OPEX REQUIREMENTS

Additional RequirementsSteam CaseAll Electric CaseCapex ImpactOpex Impact
Waste Heat Boiler (WHB)YesNoHighN/A
Steam DrumYesNoMediumN/A
Steam TurbineYesNoHighN/A
Surface CondenserYesNoMediumN/A
DeaeratorYesNoLowN/A
BFW PumpsYesNoLowLow
Extensive Piping & ValvesYesNoHighN/A
Net Power ImportLowHighLowHigh
DM Water ConsumptionHighLowN/AMedium